The Cabinet installation order varies from the Floor Stand configuration. Please follow the steps in the respective order for the Wall-mount configuration:
- Cabinet C moved to the center of the installation position, and Cabinet B placed to the left side of Cabinet C
- Hex wrench used to help align and ensure no tile-to-tile steps before engaging five locking bolts from Cabinets C and B
- Locked hooks on Cabinets B and C using ten hexagonal screws
- Cabinet D installed to right of Cabinet C
(aligned, engaged locking bolts, locked hooks) - Cabinet E installed to right of Cabinet D
(aligned, engaged locking bolts, locked hooks) - Cabinet A installed to left of Cabinet B
(aligned, engaged locking bolts, locked hooks)
Please move on to install the System Control Box first before installing the LED Modules
For cabinet installation order of the wall-mount configuration, please click here.