The Cabinet installation order varies from the Floor Stand configuration. Please follow the steps in the respective order for the Wall-mount configuration:

  1. Cabinet C moved to the center of the installation position, and Cabinet B placed to the left side of Cabinet C
  2. Hex wrench used to help align and ensure no tile-to-tile steps before engaging five locking bolts from Cabinets C and B
  3. Locked hooks on Cabinets B and C using ten hexagonal screws
  4. Cabinet D installed to right of Cabinet C
     (aligned, engaged locking bolts, locked hooks) 
  5. Cabinet E installed to right of Cabinet D
     (aligned, engaged locking bolts, locked hooks) 
  6. Cabinet A installed to left of Cabinet B
     (aligned, engaged locking bolts, locked hooks) 


Please move on to install the System Control Box first before installing the LED Modules


For cabinet installation order of the wall-mount configuration, please click here.



Recommended Links

"How do I install a DVLED display with a Wall-mount configuration?"