The Cabinet installation order varies from the Wall-mount configuration. Please follow the steps in the respective order for the Floor Stand configuration:
- Cabinet B moved to the left side of the floor stand bracket
 - Ensured rear-cabinet mounting bracket is securely placed onto the top cross beam of the floor stand
 - Ensured notches under the cabinet are fitted into the protrusions of the system control box
 - Aligned the screw holes on the cabinet and the top cross beam, then secured with supplied screws
 - Cabinet A installed on the left side of Cabinet B. Snapped Cabinet A into the pins of the system control box
 - Hex wrench used to help align and ensure no tile-to-tile steps before engaging five locking bolts from Cabinets A and B
 - Locked hooks on Cabinets A and B using ten hexagonal screws
 - Cabinet C installed to right of Cabinet B
(aligned, engaged locking bolts, locked hooks) - Cabinet D installed to right of Cabinet C
(aligned, engaged locking bolts, locked hooks) - Cabinet E installed to right of Cabinet D
(aligned, engaged locking bolts, locked hooks) 
Please move on to install the LED Modules
For cabinet installation order of the wall-mount configuration, please click here.