Answer: Before attaching the System Control Box Cover, connect the control box’s power cable to the control box cover's Power Button, and then install the cover with screws to complete the installation of the System Control Box.
What do I need to do before installing the System Control Box Cover for a DVLED Display? Print
Modified on: Mon, 22 Nov, 2021 at 5:47 PM
Did you find it helpful? Yes No
Send feedbackSorry we couldn't be helpful. Help us improve this article with your feedback.